I.T. system - medical locations

View previous topic View next topic Go down

I.T. system - medical locations

Post by Andy B on Sun Dec 02, 2012 9:00 am

A question posed to me by a contractor......... Where an I.T. system is installed as per Reg 710.411.6.3.1 and shown on Fig 710.2, is there any requirement for that final circuit wiring to be segragated and ran in seperate containment, from other circuits of that location ?